Risk Score
The Risk Score tab on an asset's detail view shows a single composite score (0–10) summarizing that device's risk, broken down into four weighted factors.
How the score is calculated
Each factor contributes to the total using the same formula:
Contribution = Weight × Raw value
The Risk Score is the sum of all four factor contributions. In the example above: 0.50 × 9.8 + 0.20 × 0 + 0.10 × 0 + 0.20 × 7.5 = 6.40 (High).
Weights are configured enterprise-wide, not per asset. See Settings → Application → Risk Score Settings in the Enterprise - Application Settings guide to view or change them.
Factors
Factor | Default weight | Raw value | Card also shows |
|---|---|---|---|
Vulnerabilities | 50% | Max CVSS v3.1 score across the asset's open CVEs | CVE count, a link to View Vulnerabilities |
Alerts | 20% | Highest pending alert severity (Low=2.5, Medium=5, High=7.5, Critical=10) | Pending alert count, a link to View Alerts |
Misconfigurations | 10% | 10 if any abnormal misconfiguration exists on the asset, else 0 | Normal/Abnormal status, a link to View Misconfigurations |
Asset Criticality | 20% | The asset's assigned criticality (Low=2.5, Medium=5, High=7.5, Critical=10) | Criticality label, an Edit criticality link |
Each factor card shows its own weight, raw value, and the resulting contribution, so you can see exactly which factor is driving the score up or down for that device.
Reading the scale
The Risk Score header shows a colored gauge with the current score marked against four bands:
0 – 2.5: Low
2.5 – 5: Medium
5 – 7.5: High
7.5 – 10: Critical
Asset Criticality
Unlike the other three factors, Asset Criticality is not derived automatically — it is a per-asset field an operator sets manually. Click Edit criticality on the Asset Criticality card to change it (Low/Medium/High/Critical); the Risk Score recalculates immediately using the new value.